CERC Regulations 11अध्याय II · Procedure for Regulation of Power Supply
धारा 11 · Section 11
अक्षर आकार — स्तर 1, कुल 4 में से
(1)
During the period of regulation of power supply, the Regulated Entity shall restrict its drawal to the revised schedule given by the Load Despatch Centre and the deviations, if any, from the drawal schedule shall be subjected to unscheduled inter-change charges in accordance with the Central Electricity Regulatory Commission (Unscheduled Inter-change charges and related matters) Regulations, 2009, as amended from time to time.(2)
The Regional Load Despatch Centre or State Load Despatch Centre, as the case may be, during the period of regulation of power supply, shall consider the regulation of power supply taking into consideration grid security, and may temporarily suspend implementation of the plan of regulation of power supply, if in its opinion, grid security is in imminent danger.(3)
The concerned Regional Load Despatch Centre shall keep Member-Secretary, Regional Power Committee of the region informed of the implementation of the regulation of power supply.इस धारा पर आपका निजी नोट
यह नोट सिर्फ़ आप देख सकते हैं।