TNERC Regulations 66Chapter C · Format for Assessing Competence of Applicant
Section 66 · kV
Text size — level 1 of 4
Others (specify)Shunt Reactor (Nos. and Capacity in MVA)Static Var Compensator(Nos. and Capacity in MVAR)Number of BaysCommercial InformationMetering Points and StatusGeneration to Transmission(G-T) Interconnection Point TotalInterconnection PointsNo. of points with ToD metersNo. of points un-meteredTransmission to Transmission(T-T) Interconnection Point TotalInterconnection PointsNo. of points with ToD metersNo. of points un-meteredTransmission to Distribution(T-D) Interconnection PointTotal Interconnection PointsNo. of points with ToD metersNo. of points un-meteredCommunication and Commercial SystemIs there a SCADA system available?If yes, detailsDetails of arrangement with theLoad Dispatch Centre (LDC)Existing Communication System(VSAT/ PSTN/ GSM etc)Transformation Loss (%)Note: