OERC Regulations 8
Section 8 · Criteria for allowing open access to intra-state transmission and/or distribution systems
Text size — level 1 of 4
(1)
Long-term access shall be allowed in accordance with the transmission and distribution planning capacity criteria stipulated in the Orissa Grid Code and/or the Orissa Distribution (Planning and Operation) Code, as the case may be.(2)
Short-term access shall be allowed if the request can be accommodated by utilising;(a)
Inherent design margins;(b)
Margins available due to variation in power flows and unutilised capacity, if any;(c)
Margins available due to in-built spare capacity in transmission and/or distribution systems created to cater to future load growth.Your private note on this section